 |
Fees
Overweight Permits
| Minimum fee for Overweight Permit |
|
$14.00 |
*The fee for weights in excess of 100,000 pounds is $4.25
plus $0.50 for each 5,000 pound increment or
portion thereof exceeding 100,000 pounds.
Overwidth Fees
| Single Trip |
|
$10.00 |
| Monthly (30 days) up to 14' wide |
|
$20.00 |
| Annual up to 14' wide |
|
$240.00 |
*Manufactured Housing 14 feet 12 inches (12 inches is eave)
Overheight Fees
| Single trip |
|
$10.00 |
| Monthly (30 days) up to 15 ft high |
|
$20.00 |
| Annual up to 15 feet high |
|
$240.00 |
Overlength Fees
| Single Trip |
|
$10.00 |
| Monthly (30 days) |
|
$10.00 |
| Monthly (over 15 ft ROH, or 3 ft FOH) |
|
$10.00 |
| Annual |
|
$120.00 |
| Annual: (Single Trailer up to 56 ft) |
|
$100.00 |
| Annual: (Double Trailer to 68 ft) |
|
$100.00 |
| Annual: (Non-divisible load up to 61 ft) |
|
$120.00 |
Other Fees
| Monthly (30 days) overwidth and/or overheight |
|
$20.00 |
| Monthly (30 days) overwidth, height, and length |
|
$30.00 |
| Annual overwidth, height, and length |
|
$360.00 |
| Annual (14x85 Manufactured Housing only) |
|
$150.00 |
| Transfer (Original permit must be returned) |
|
$14.00 |
| Lost or Replaced (Proof of purchase required) |
|
$14.00 |
| Trip Permit (DOL) |
|
$20.00 |
| Fuel Permit (DOL) |
|
$25.00 |
Collection Truck Fees
| Annual Over Axle for 2-Axle up to 6,000 lbs |
|
*$42.00 |
| Annual Over Axle for 3-Axle up to 8,000 lbs |
|
*$42.00 |
*per thousand pounds (annual permit only).
Fixed Loads Fees
| Monthly (30 days) 3-Axle 65,000 lbs maximum |
|
*$70.00 |
| Monthly (30 days) 4-Axle 86,000 lbs maximum |
|
*$90.00 |
**may include dimensions Temporary Additional Tonnage
| Temporary Additional Tonnage |
|
$*2.80 |
* per day per 2,000 pound (min. 5 days, max. 10 days)
Farm Implements (for farmers in the course of farming)
| Single Trip |
|
$10.00 |
| Three-Month Period |
|
$10.00 |
| Annual |
|
$25.00 |
Farm Implements (for sale, repair, or maintenance)
| Three month |
|
$25.00 |
| Annual |
|
$100.00 |
Log Tolerance Fees
| Annual (April 1--March31) |
|
$50.00 |
| Purchased after July1 |
|
$37.50 |
| Purchased after October 1 |
|
$25.00 |
| Purchased after January 1 |
|
$12.50 |
| Transfers |
|
$14.00 |
|
 |